Top of page
Global Site Navigation

School of Natural Sciences

Local Section Navigation
You are here:
ECU is currently converting this web content to a more mobile friendly format. If you find the content below is not formatting correctly during this transition please view on desktop browser.
Main Content

Remediation of a south-western Australian acid pit lake waters with oxic liming and an aerobic wetland

A mine water treatment system was constructed at Griffin Coal Mining Company Limited in Collie Western Australia, to remediate acidified mine lake water from the nearby Chicken Creek pit lake (pH 3, containing approximately 8 million m3 of water) and make it suitable for cultivating plants or fish.

The first part of pit water treatment is a two-stage liming system utilising a fluidised bed of limestone. At each stage of liming there is a settling pond to remove particulate iron and aluminium oxyhydroxides. From here the limed water gravity-feeds back to the lake though 5ha constructed aerobic ’polishing’ wetland.

This study is evaluating the way in which fluidised liming and aerobic wetland treatment can remediate pH and elevated metal concentrations in water from a typical recently groundwater-filled acid pit lake of Collie. Both water chemistry analyses and toxicity teas are being undertaken to evaluate water quality at each stage of treatment in order to better understand the processes taking place in this treatment system. The conclusions and recommendations of this project will enable better design of such systems for this mining region.


Researchers

Dr Clint McCullough
Associate Professor Mark Lund
Griffin Coal, Mr David Bills

Skip to top of page